{"id":169,"date":"2014-09-18T20:02:37","date_gmt":"2014-09-18T20:02:37","guid":{"rendered":"https:\/\/nercconsultants.com\/?page_id=169"},"modified":"2016-01-20T23:11:54","modified_gmt":"2016-01-20T23:11:54","slug":"prc-005-2-training","status":"publish","type":"page","link":"https:\/\/nercconsultants.com\/?page_id=169","title":{"rendered":"PRC-005 Scheduled Webinars"},"content":{"rendered":"<h4>Training Agenda:<a href=\"https:\/\/nercconsultants.com\/wp-content\/uploads\/2014\/09\/rudd-transformer-001-e1410745694932.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-84\" src=\"https:\/\/nercconsultants.com\/wp-content\/uploads\/2014\/09\/rudd-transformer-001-e1410745694932.jpg\" alt=\"\" width=\"305\" height=\"284\" srcset=\"https:\/\/nercconsultants.com\/wp-content\/uploads\/2014\/09\/rudd-transformer-001-e1410745694932.jpg 800w, https:\/\/nercconsultants.com\/wp-content\/uploads\/2014\/09\/rudd-transformer-001-e1410745694932-300x279.jpg 300w\" sizes=\"auto, (max-width: 305px) 100vw, 305px\" \/><\/a><\/h4>\n<ul>\n<li>Review of NERC Standard PRC-005-1.1b (Applicability, Compliance Requirements and Measures)<\/li>\n<li>Review of NERC Standard PRC-005-2(i) (Applicability, Compliance Requirements and Measures)<\/li>\n<li>Introduce\u00a0of NERC Standard PRC-005-6 (Applicability, Compliance Requirements and Measures)<\/li>\n<li>Preview the revised NERC Bulk Electric System definition<\/li>\n<li>Examine the NERC Protection System definition\n<ul>\n<li>Protective Relays<\/li>\n<li>Communication Systems<\/li>\n<li>CTs and PTs<\/li>\n<li>Station dc Supply<\/li>\n<li>Control Circuitry<\/li>\n<\/ul>\n<\/li>\n<li>Examine the\u00a0Automatic Reclosing definition\n<ul>\n<li>Reclosing relay<\/li>\n<li>Supervisory relay(s) or function(s) &#8211; relay(s) or function(s) that perform voltage and\/or sync check functions that enable or disable operation or the reclosing\u00a0relay<\/li>\n<li>Voltage sensing devices associated with the supervisory relay(s) or function(s)<\/li>\n<li>Control circuitry associated with the reclosing relay or supervisory relay(s) or function(s)<\/li>\n<\/ul>\n<\/li>\n<li>Examine the Sudden Pressure Relaying definition\n<ul>\n<li>A system that trips an interrupting device(s) to isolate the equipment it is monitoring and includes the following Components:\n<ul>\n<li>Fault pressure relay &#8211; a mechanical relay or device that detects rapid changes in gas pressure, oil pressure, or oil flow that are indicative of Faults within liquid-filled, wire-wound equipment<\/li>\n<li>\u00a0Control circuitry associated with a fault pressure relay<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<li>Describe the NERC PRC-005-6 Maintenance Tables<\/li>\n<li>Identify best practice strategies\u00a0for maintenance and testing to demonstrate compliance<\/li>\n<li>Outline auditing best practices to assist in maintaining and demonstrating compliance<\/li>\n<\/ul>\n<p style=\"font-weight: normal; font-size: 14px; text-align: center;\">For a list of our PRC-005-6 live webinars, <a href=\"https:\/\/nercconsultants.com\/?page_id=400\" target=\"_top\"><b>Click here!<\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Training Agenda: Review of NERC Standard PRC-005-1.1b (Applicability, Compliance Requirements and Measures) Review of NERC Standard PRC-005-2(i) (Applicability, Compliance Requirements and Measures) Introduce\u00a0of NERC Standard PRC-005-6 (Applicability, Compliance Requirements and Measures) Preview the revised NERC Bulk Electric System definition Examine the NERC Protection System definition Protective Relays Communication Systems CTs and PTs Station dc Supply<\/p>\n<p><a href=\"https:\/\/nercconsultants.com\/?page_id=169\" class=\"more-link themebutton\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-169","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/pages\/169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nercconsultants.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=169"}],"version-history":[{"count":27,"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/pages\/169\/revisions"}],"predecessor-version":[{"id":543,"href":"https:\/\/nercconsultants.com\/index.php?rest_route=\/wp\/v2\/pages\/169\/revisions\/543"}],"wp:attachment":[{"href":"https:\/\/nercconsultants.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}