Training Agenda:
- Review of NERC Standard PRC-005-1.1b (Applicability, Compliance Requirements and Measures)
- Review of NERC Standard PRC-005-2(i) (Applicability, Compliance Requirements and Measures)
- Introduce of NERC Standard PRC-005-6 (Applicability, Compliance Requirements and Measures)
- Preview the revised NERC Bulk Electric System definition
- Examine the NERC Protection System definition
- Protective Relays
- Communication Systems
- CTs and PTs
- Station dc Supply
- Control Circuitry
- Examine the Automatic Reclosing definition
- Reclosing relay
- Supervisory relay(s) or function(s) – relay(s) or function(s) that perform voltage and/or sync check functions that enable or disable operation or the reclosing relay
- Voltage sensing devices associated with the supervisory relay(s) or function(s)
- Control circuitry associated with the reclosing relay or supervisory relay(s) or function(s)
- Examine the Sudden Pressure Relaying definition
- A system that trips an interrupting device(s) to isolate the equipment it is monitoring and includes the following Components:
- Fault pressure relay – a mechanical relay or device that detects rapid changes in gas pressure, oil pressure, or oil flow that are indicative of Faults within liquid-filled, wire-wound equipment
- Control circuitry associated with a fault pressure relay
- A system that trips an interrupting device(s) to isolate the equipment it is monitoring and includes the following Components:
- Describe the NERC PRC-005-6 Maintenance Tables
- Identify best practice strategies for maintenance and testing to demonstrate compliance
- Outline auditing best practices to assist in maintaining and demonstrating compliance
For a list of our PRC-005-6 live webinars, Click here!